Air Conditioning Engineering Works
This project is included for the one-to-one replacement of existing fan coil units (FCUs) in
HTD. The dismantlement of the existing FCU, including associated pipework, power
connections and control cables shall be carried out. After that, the installation for new FCU
shall be conducted, not limited to the existing connections of chilled water/ condensate pipes
airduct and power supply with accessories including the rectification of defects during the
Defects Liability Period (DLP).
Client
MTRC
Period
May 2024 - Sep 2024