This project is included for the one-to-one replacement of existing fan coil units (FCUs) in HTD. The dismantlement of the existing FCU, including associated pipework, power connections and control cables shall be carried out. After that, the installation for new FCU shall be conducted, not limited to the existing connections of chilled water/ condensate pipes airduct and power supply with accessories including the rectification of defects during the Defects Liability Period (DLP).
Client
MTRC
Period
May 2024 - Sep 2024
Project Description
Air Conditioning Engineering Works
Careers
Innovation & Good Practice Innovation Good Practice
Our Business job reference
THF Engineering Company Limited
This project is included for the one-to-one replacement of existing fan coil units (FCUs) in HTD. The dismantlement of the existing FCU, including associated pipework, power connections and control cables shall be carried out. After that, the installation for new FCU shall be conducted, not limited to the existing connections of chilled water/ condensate pipes airduct and power supply with accessories including the rectification of defects during the Defects Liability Period (DLP).
Client
MTRC
Period
May 2024 - Sep 2024
Project Description